ABS fasteners Enpowering Power Industry

Our bolting systems have provided the power generation industry with significant productivity enhancements by reducing job time, enhancing safety and improving overall job quality.

Power

In the power generation business, every minute of downtime results in a loss of production and revenue. Our Bolting systems and fasteners have proven to reduce maintenance times by as much as 50%. From gas, steam and wind turbines to solar farms and everything in between, our productivity enhancing bolting systems are a dependable way to get back on line faster

  • APPLICATIONS
  • CASE STUDIES
  • RECOMMENDED TOOLS and FASTERNERS
APPLICATIONS

High Pressure Pipe Flanges, Steam Press, Pipe Flanges, Piping on Turbines, Generator rotors, Heat Exchangers, Reactor Heat Exchangers, Turbine (Regular Bolt), Turbine (Heater Bolt), Coupling Bolt, Turbine Condensation Set, Steam Turbine Cover, Rotary Pump, Boiler Feed Pump, Feed Water Pump, Reactor, Gas Filters, Gas Compressors, Gas & Other Pumps, Throttle & Intercept Valve, Generator End Bracket, Steam Inlet Lead Flange.

CASE STUDIES

GE Power

Kirloskar

Reliance Utilities Ltd.

RECOMMENDED TOOLS and FASTERNERS

Stealth, Avanti, HYTORC Nut and Washer

GET IN TOUCH

Advanced Bolting Solutions Pvt. Ltd.

ABS House Plot W116(A), TTC Industrial Area Khairane MIDC,Navi Mumbai 400 710, Maharashtra, India